In most functional test (FCT) programs, the customer defines what a working board is and supplies the test procedure, fixture, test software, firmware and pass/fail limits. The contract manufacturer runs the test to that procedure and handles failed boards under rules both sides have agreed on. That is how we work at PCBCart. We run your functional test, but we don't write it, and the handoff goes smoothly only when every item has a named owner before the first build.
What does a CM need to run your functional test?
We need five things: a written procedure an operator can follow, a working fixture, the test software, released firmware, and numeric limits that let a technician judge a board without calling you. If any one of them is missing, boards pile up at the end of the line waiting for answers.
The procedure is where most programs fall short. The script your design engineer runs on the bench assumes the person running it knows the board. A procedure for a production test station has to assume the opposite. It should state the power-up sequence, the current limit on the bench supply, the order of steps, what the operator sees on screen at each step, and exactly what to do when a step fails. If a step says "check that the board boots," we will ask what booting looks like and how long to wait for it. The operator screen matters as much as the document: it should show a clear pass or fail and the step that failed, not raw instrument readings for the operator to interpret.
It also helps to know where FCT sits in the flow. Before your board reaches the test station, it has already been checked in several ways. Every bare board we build goes through electrical test for opens and shorts, assembled boards go through 3D SPI, AOI and, where needed, offline X-ray, and new builds can go through first article inspection before the rest of the lot runs.
Those steps confirm the board was built as drawn. FCT is the first step that asks whether the board does its job, and it is poor at telling you why it doesn't. A failed FCT step points to a function, not a solder joint, which is why the structural tests upstream still matter.
When you send a functional test package, this is the checklist we work from:
Test specification with a revision number and release date
The fixture, plus spare pogo pins and other wear items
Test PC with software licenses and drivers installed, and their versions documented
Firmware binaries with checksums, and a note on which version goes with which build
At least one golden board, and a known-bad board if you have one
Pass/fail limits table, versioned to match the specification
A named contact for escalations, with their time zone
Who owns the fixture, software and firmware?
You do, in almost every case, and that is the arrangement we recommend. The fixture, the software and the firmware all encode design knowledge that lives with your engineering team. When something about them needs to change, you are the only party who can decide how.
The fixture. A functional test fixture carries decisions about which test points to contact, what loads to apply, how to sequence power and which signals to monitor. Those decisions come from the schematic, which we don't design. Most customers have a fixture house build a clamshell or bed-of-nails fixture to their drawings, then ship it to us for the build. During DFM review, we can comment on the board side of that interface: whether the board will be tested in the panel or singulated, and which test pads sit too close to tall parts or end up under coating. Whether we can arrange a test fixture for a particular project is something to confirm with our engineering team. Don't build your schedule around it until that is settled.
Boards for fixture fit-up. A fixture house works from your board data, but it usually needs a few assembled boards to align the probe plate and prove contact before the fixture ships. If you don't have boards from an earlier build, order a small separate lot for this. Finding a misaligned pin on a handful of boards costs far less than finding it on the first day of the production run.
Fixture type and site utilities. Tell us how the fixture is actuated before it arrives. A manual clamshell needs nothing but bench space. A pneumatic fixture needs compressed air at the station, so send the pressure and fitting requirements and confirm them with our engineering team. If your fixture or instruments were built for 120 V / 60 Hz power, check that they are rated for the local supply at the factory that will run the test. If you have several low-volume part numbers, a common base with a swappable probe plate for each board keeps setup and storage simpler, as long as every plate carries its own ID and revision label.
High-voltage tests. If your test applies hipot or any other high voltage, the safety enclosure and interlocks are part of the fixture package you supply. We run the station under your written safety instructions and never modify or bypass interlocks.
You may see synthetic stone fixtures on our line. Those are carriers for soldering and board handling, not test fixtures, and they shouldn't be read as an FCT capability.
The test software. It is tied to your instruments, your product logic and often to licenses held in your company's name. The cleanest setup is a test PC that you configure, verify at your bench and ship with the fixture. Document the exact versions of the runtime, drivers and any instrument libraries, because a driver mismatch is one of the more common reasons a station that worked at your bench won't start at ours.
Instruments. Power supplies, DMMs, programmers and any custom interface boxes are supplied by you. We don't calibrate test instruments. If your limits depend on a calibrated meter, send it with its certificate and track its due date on your side.
Firmware. This is your IP and your release decision. Tell us which of two flows you use, because they are handled differently on the floor:
The board is programmed with production firmware first and then tested.
Your FCT station loads a test firmware image, runs the tests, and flashes production firmware as the last step.
In both cases, send checksums and a release note with each new image. We usually ask that firmware come through the same channel as your other engineering documents rather than as a chat attachment, so there is a record of which image was approved for which build.
How should pass/fail criteria and test records be defined?
Limits should be numeric, versioned and owned by you. Your test software should produce records detailed enough to reconstruct what happened to any single board months later.
The weakest criteria we see are visual or subjective. Two operators on two shifts will judge "LED lights up" differently unless you specify the color, and ideally have the software read it instead of relying on someone's eye. "Board responds on UART" needs a timeout and an expected string. The table below shows the level of detail that works on a production floor. It illustrates the format only; the values come from your design.
| Step | Measurement | Lower limit | Upper limit | Retries |
|---|---|---|---|---|
| 1 | Input current at power-up, no load | 0 mA | Your value | 0 |
| 2 | 3V3 rail voltage | Your value | Your value | 1 |
| 3 | UART boot string received | String match | Timeout in seconds | 1 |
| 4 | Status LED color (via sensor) | Expected value | Expected value | 0 |
| 5 | Firmware version read-back | Exact match | Exact match | 0 |
The retry column deserves attention. A board that fails, gets reseated and passes on the third try is often a marginal board, and a generous retry rule hides it. We usually suggest one retest after reseating. If the board fails again, it goes on hold instead of getting another attempt. You set the rule, and we follow it as written.
Failure handling needs its own agreement. If a failed board shows a workmanship defect such as a solder bridge, a missing part or a wrong value, we rework it and retest it under the same procedure. Failures that point to firmware, design margin or component behavior go back to your engineering team with the test logs. Agreeing on that split in advance keeps boards from sitting in a hold area while each side waits for the other.
For test records, the minimum we recommend per board is the serial number, test software version, firmware version, fixture ID, date and time, and the measured value for each step rather than a single pass/fail flag. Measured values let you see a rail drifting toward its limit across lots before it starts failing. We track builds in our Smart MES. Whether your station's log files can be linked to those build records depends on the output format of your software, so confirm the format with our engineering team when you set up the program.
How do you keep fixtures working across builds?
Treat the fixture as a production tool with its own revision, maintenance log and storage plan. On repeat orders, months can pass between builds, and a fixture that has sat idle needs to prove it still works before it touches new boards.
Pogo pins wear out. Your pin supplier's datasheet gives a rated cycle life, and the fixture should come with a replacement interval based on it, along with spare pins. Flux residue on test pads also degrades contact over time, so tell us if certain pads need cleaning before test, or keep test pads away from areas where residue collects.
Board revisions are the bigger risk. A layout change that moves one test point by a few millimeters can make a fixture useless, and nobody notices until the first board of the new revision sits in the fixture. Your engineering change process should include a fixture-impact check, and the fixture should carry a label stating which board revisions it supports.
Decide where the fixture lives between builds. If you want it kept at our factory instead of shipped back, confirm that arrangement with our engineering team before the first build. Wherever it is stored, verify the station with the golden board before each new build. We build in Hangzhou and Thailand, and a fixture can only be in one place at a time, so confirm which site will run FCT for your order.
Who is responsible for what?
The table below is our starting point. Most programs adjust a few rows; what matters is that the changes are made in writing before the first build.
| Item | Customer | PCBCart | Notes |
|---|---|---|---|
| Functional test specification | Owns | Reviews for operability | Operator-level steps, revision controlled |
| Pass/fail limits | Owns | Applies as written | Numeric, versioned with the spec |
| Fixture design and build | Owns | Comments on board-side interface | Arranging a fixture: confirm with our engineering team |
| Assembled boards for fixture fit-up | Orders | Builds as a separate lot | Before the production run |
| Fixture utilities (compressed air, power) | Specifies | Confirm with our engineering team | Check at the site that runs FCT |
| High-voltage safety enclosure and interlocks | Supplies | Operates per your safety instructions | Never modified on site |
| Fixture wear parts | Supplies spares and interval | Replaces as you instruct | |
| Test software and licenses | Owns | Runs as instructed | Exact versions documented |
| Test PC and instruments | Supplies | Operates | Calibration stays with the customer |
| Firmware release | Owns | Programs as instructed | Checksums with every image |
| Golden and known-bad boards | Supplies | Uses for station verification | |
| Running the test | Owns | Per your procedure | |
| Retest and hold rules | Defines | Follows as written | |
| Workmanship defects found at FCT | Reworks and retests | ||
| Design or firmware failures | Owns | Returns boards with logs | |
| Test record content and format | Defines | Delivers as agreed | Format confirmed at setup |
| Fixture storage between builds | Decides | Confirm with our engineering team | |
| Engineering changes | Owns | Flags revision changes at order |
If you are preparing an RFQ that includes functional test, send the specification and this matrix along with your Gerber files and BOM. It saves a round of questions and lets us quote on your actual procedure instead of a placeholder.
FAQ
Can functional test replace AOI, X-ray or flying probe on our assembly?
No. Those methods check how the board was built, while FCT checks how it behaves. A board can pass FCT with a marginal joint that fails later.
Our firmware won't be final when the boards are built. Can you still run FCT?
Usually, yes. Test with a dedicated test image, then program the production firmware once it is released, with a version read-back so the record shows both.
Should FCT run in the panel or after depaneling?
Panel testing saves handling but ties the fixture to the panel layout. Testing singulated boards catches depaneling damage, which matters when parts sit near the break line.
Who pays when a fixture wears out or breaks?
Settle it before the first build. A common split is that the customer covers wear parts and redesigns, and handling damage is discussed case by case.
Do we need a separate test if the boards go into a box build?
Often, yes. Board-level FCT checks each PCBA. A system test after final assembly checks that the cables, connectors and enclosure-mounted parts work together, and it needs its own procedure and limits from you.